simtime objects allow the user to specify simulation start and end times,
along with the simulation time step.
Usage
tgrid(
start = 0,
end = 24,
delta = 1,
add = numeric(0),
.offset = 0,
.scale = 1,
...
)
# S4 method for class 'tgrid'
stime(x, ...)
# S4 method for class 'tgrids'
stime(x, ...)
# S4 method for class 'numeric'
stime(x, ...)
# S4 method for class 'tgrid'
show(object)
# S4 method for class 'tgrids'
show(object)
# S4 method for class 'mrgmod'
stime(x, ...)
Arguments
- start
simulation start time.
- end
simulation end time.
- delta
simulation time step.
- add
addition simulation times.
- .offset
the resulting set of times will be adjusted by this amount.
- .scale
the resulting set of times will be scaled by this factor.
- ...
not used.
- x
tgrid object.
- object
passed to show
Examples
peak <- tgrid(0, 6, 0.2)
sparse <- tgrid(0, 24, 4)
day1 <- c(peak, sparse)
design <- c(day1, day1+72, day1+240)
if (FALSE) { # \dontrun{
mod <- mrgsolve::house()
out <- mod %>% ev(amt=1000, ii=24, addl=10) %>% mrgsim(tgrid=design)
plot(out, CP ~ time, type = 'b')
} # }